Three Sixty Design Solutions where appointed to assess the viability of consolidating an existing oil Blend Lab, Blend Shop and oil storage into a consolidated Blend Centre facility; situated in the site grounds. As well as modernisation of equipment and processes. A number of options where considered as part of a feasibility study. The study concluded that the building may be refurbished to facilitate the blending processes, however removal and construction of a new building would provide the best approach to achieving sustainability targets, longevity of the building and flexibility of future growth. In accordance with the Client’s aspiration to achieve a
Net Zero Carbon site, careful consideration was given to the use of renewable / sustainable equipment and plant.
Architectural design
Feasibility report
Space Planning
Mechanical services feasibility
Three Sixty Design Solutions,
Apuldram, Chichester, PO20 7EG